• Login
    • Login
    Advanced Search
    View Item 
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Arts & Social Sciences, Law, Business Mgt (FoA&SS / FoL / FBM)
    • View Item
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Arts & Social Sciences, Law, Business Mgt (FoA&SS / FoL / FBM)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The implementation of public building projects: A case study of ministry of works, housing and physical planning

    Thumbnail
    View/Open
    Full text (80.25Mb)
    Date
    1986
    Author
    Khang'ati, Alfred
    Type
    Thesis
    Language
    en
    Metadata
    Show full item record

    Abstract
    The construction of buildings and other related infra-structural facilities has been identified as one of the means through which the Government of Kenya can realize its objectives, i.e. to alleviate poverty, create enough employment opportunities,and also, improve health standards. As a result, this aspect of national development receives a lot of priority, especially in the approval and funding of its programmes. Despite the good intentions and priority in funding that the building construction activities receive, there is general discontent about the way the activities are implemented. It is observed that those charged with the responsibility do not carry it out as efficiently as would be required. As a result, many building activities are completed behind the scheduled completion time and after having generated alot of unnecessary costs. It is out of the need to verify this assertion, and if true provide solutions to it, that this study was borne. The study can be logically divided into two: the first part which deals with Literature review and formulation of the theoretical framework, and the second part which presents the findings of the survey. In the second part, there are also recommendations. These are made in the light of the findings and the theoretical background provided. In respect to the survey and findings made, it is noted that the hypothesis of the study is proved valid, but with qualifications. It is noted that lack of proper planning and control is not the only factor that causes delays during the implementation of projects.
    URI
    http://erepository.uonbi.ac.ke:8080/xmlui/handle/123456789/16350
    Citation
    M.A (Building Management) Thesis 1986
    Sponsorhip
    University of Nairobi
    Publisher
    Faculty of Arts, University of Nairobi
    Description
    Master of Arts Thesis
    Collections
    • Faculty of Arts & Social Sciences, Law, Business Mgt (FoA&SS / FoL / FBM) [24587]

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback

     

     

    Useful Links
    UON HomeLibrary HomeKLISC

    Browse

    All of UoN Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback