• Login
    • Login
    Advanced Search
    View Item 
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Arts & Social Sciences, Law, Business Mgt (FoA&SS / FoL / FBM)
    • View Item
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Arts & Social Sciences, Law, Business Mgt (FoA&SS / FoL / FBM)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Identification of waste determining factors in the Kenyan construction industry

    Thumbnail
    View/Open
    fulltext (104.4Mb)
    Date
    2007
    Author
    Kioko, Charles W
    Type
    Thesis
    Language
    en
    Metadata
    Show full item record

    Abstract
    Waste can significantly affect the business performance and productivity of contracting organisations. This study sought to investigate the sources, types and causes of waste within construction firms in Kenya focusing on design and construction firms. Literature was reviewed and gaps identified based on studies carried locally and internationally. Therefore it was noted that waste in construction is not only focused on the quantity of waste of materials on-site, but also related to several activities in design and construction phases. Based on contractors and design consultants' perceptions, data was collected through questionnaires from 39 respondents. Analysis of Variance' and Spearman's Rank Correlation tests were performed on43waste variables to establish their significance and causal links. The findings of the research suggest that thirteen (13) factors were found to be the significant variables that influence waste: measuring overall productivity; influence by contractors over design; manner (effectiveness) of information exchange between contractors and design consultants; incorporating waste minimization in processes; lack of trade skills; slow decision making; poor planning and scheduling; inappropriate construction methods; poor design; waiting for equipment to arrive; frequent equipment breakdown; materials not meeting specifications; and lack of effective supervision. These factors were significant in cost, quality and time performance of a project............................................
    URI
    http://erepository.uonbi.ac.ke:8080/xmlui/handle/123456789/29024
    Citation
    M.A
    Sponsorhip
    University of Nairobi
    Publisher
    University of Nairobi
     
    Department of Construction management
     
    Collections
    • Faculty of Arts & Social Sciences, Law, Business Mgt (FoA&SS / FoL / FBM) [24587]

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback

     

     

    Useful Links
    UON HomeLibrary HomeKLISC

    Browse

    All of UoN Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback