• Login
    • Login
    Advanced Search
    View Item 
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Engineering, Built Environment & Design (FEng / FBD)
    • View Item
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Engineering, Built Environment & Design (FEng / FBD)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Challenges facing settlement executive committees in slum upgrading programs in Kenya. A case study of Eldoret municipality

    Thumbnail
    View/Open
    Full text (353.1Kb)
    Date
    2014
    Author
    Nyaigo, Daniel M
    Type
    Thesis; en_US
    Language
    en
    Metadata
    Show full item record

    Abstract
    The main objective of this study was to investigate the challenges facing Settlement Executive Committee (SEC) under slum upgrading programmes in Munyaka, Kamukunji and Huruma slums of Eldoret Municipality, Uasin Gishu County, Kenya. The specific objectives of the study were to: find out the composition of SEC membership under slum upgrading initiatives within the study area; examine the role of SEC in slum upgrading initiatives within the study area; identify the strategies used by SEC in execution of its role in slum upgrading within the study area; examine the challenges facing SEC in execution of its role in slum upgrading within the study area; and to recommend practicable solutions to curb the challenges. The target population in the study consisted of 57 settlement executive committee members. Since the target population was small census was used and the target population was the sample size. Primary data was collected from 57 SEC members by use of a semi structured questionnaire and secondary data was collected from published and unpublished information sources. Descriptive statistics was used to analyze data by way of percentages, weighted mean scores and standard deviation. The results have been presented using tables and charts. The findings indicated that there are a number of challenges that face SEC in execution of its role in slum upgrading programme among them inadequate facilitation of SEC. The results showed that SECs have no offices and other office equipment to effectively execute its role. Therefore, there is need for the government to facilitate SEC in terms of: provision of office and other office related equipment for effective execution of their role. This entails capacity building of SEC members via incentives such as trainings, exchange visits and monthly allowances so as to increase their commitment
    URI
    http://hdl.handle.net/11295/75248
    Collections
    • Faculty of Engineering, Built Environment & Design (FEng / FBD) [1552]

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback

     

     

    Useful Links
    UON HomeLibrary HomeKLISC

    Browse

    All of UoN Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback