• Login
    • Login
    Advanced Search
    View Item 
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Education (FEd)
    • View Item
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Education (FEd)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Influence of project participants related factors on the Performance of railway infrastructure projects: A case of Nairobi commuter rail projects

    Thumbnail
    View/Open
    Fulltext (1.848Mb)
    Date
    2014
    Author
    Aoko, George O
    Type
    Thesis; en_US
    Language
    en
    Metadata
    Show full item record

    Abstract
    While delivering successful projects continues to remain a challenge in many parts of the world and more so among the developing countries such as Kenya, one cannot underscore the influence of project participants on the overall performance of such projects. This study examined the influence of project participants related factors with respect to the Critical Success Factors (CSF) namely: project manager related factors, design and supervision team related factors, contractor related factors, and client related factors in project performance with particular reference to the Nairobi Commuter Rail infrastructure projects (Syokimau, Imara Daima and Makadara railway stations) implemented by the Kenya Railways Corporation. Quantitative research method was used and descriptive survey as the research design. The sampling procedure was majorly purposeful with a sample size, N of 52 from a target population of 60. The data collection was through structured questionnaire with a response rate of 92.3% and the analysis done using SPSS. The exploratory factor analysis indicated that Client related factors had the greatest influence on the projects performance with a mean criticality index of 3.714, followed by Contractor related factors(3.375), Project manager related factors(3.125), Design/supervision team related factors(3.000). From the ANOVA, with the significant F is 0.009 and from the t-test with all values less than 0.05, it was concluded that the null hypothesis be rejected and that all the project participants’ related factors have a significant influence on the performance of railway infrastructure projects. The regression analysis showed that there was statistically moderate and positive correlation of average 0.5 between the four project participants and project performance and that 54.5 % of the project performance was attributed to the factors under the study with a further 45.5% attributed to other factors not investigated in this study. Similar study should be conducted in a different railway infrastructure project to act as a control project while measuring the similar variables and more to ascertain the objectivity of the findings in this study. This may also provide a large sample size of the target population to be able to come up with more collaborative findings.
    URI
    http://hdl.handle.net/11295/75805
    Citation
    Degree of Masters of Arts in Project Planning and Management ,2014
    Publisher
    University Of Nairobi
    Collections
    • Faculty of Education (FEd) [6069]

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback

     

     

    Useful Links
    UON HomeLibrary HomeKLISC

    Browse

    All of UoN Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback