• Login
    • Login
    Advanced Search
    View Item 
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Education (FEd)
    • View Item
    •   UoN Digital Repository Home
    • Theses and Dissertations
    • Faculty of Education (FEd)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Influence of risk management in building projects in Kenya: A case of building projects in Westlands sub - county

    Thumbnail
    View/Open
    Full-text (965.8Kb)
    Date
    2015
    Author
    Ogal, Wycliffe O
    Type
    Thesis; en_US
    Language
    en
    Metadata
    Show full item record

    Abstract
    The study investigated the influence of risk management in building projects in Westlands sub- County. The objectives of the study were to: identify procurement options, investigate strategies of risk process and establish policy influence on risk management. The research design presented in this research project report is a descriptive survey design. The target population for the study included clients, contractors and consultant in building projects within Westlands sub - county in Nairobi. A sample size of 32 out of 107 respondents was sampled using stratified random sampling technique. Validity and reliability of the research instrument was measured using Cronbach‟s alpha and split- half method respectively. Data was collected by self administered questionnaires to respondents. Data generated was analyzed using SPSS version 20. Crosstabulation was used to establish the relationship between independent and dependent variables. Chi-squire was used to establish the significance of the differences observed. Confidence level was set at 5%. Binary logistic regression was used to model the relationships established. The results were as follows: building projects in Westland County are procured via two contract type: design-bid-build (68%) and design build contracts (32%).The choice of contract options are determined by project duration/time, financial costs, legal issues and project actors. All the companies surveyed were exposed to a range of risks including risks associated with owners, contractors, political risks, financial risks and other risks. Projects procured via design-build contracts had a higher level of risks associated with designers. The various risks identified are under-mitigated while political risks are not mitigated. Effect of licensing procedures, laws and regulations and influence of policies on arbitrage was not significant for both design-build and design-bid-build. The local contractors and designers should be sensitized on risks mitigation strategies to improve the level of risks mitigation in the county. Additional studies should be conducted on the role of the newly created National Construction Authority with regards to risk in building projects and the role of quality control on project risk.
    URI
    http://hdl.handle.net/11295/90879
    Publisher
    University of Nairobi
    Collections
    • Faculty of Education (FEd) [6069]

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback

     

     

    Useful Links
    UON HomeLibrary HomeKLISC

    Browse

    All of UoN Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Copyright © 2022 
    University of Nairobi Library
    Contact Us | Send Feedback